Skip to content

Knowledge article

What Happens During an EICR?

Written by Regis ComplianceTechnically reviewed by NAPIT-registered competent personLast reviewed June 2026

During an EICR a competent person carries out a visual inspection and a series of dead and live tests on the fixed installation, then reports the results.

An EICR is a structured process combining visual inspection with electrical testing. It is carried out by a competent person using calibrated instruments and following the model forms and procedures in BS 7671 and IET guidance.

1. Preparation and sampling

Before testing begins, the electrician confirms the extent of the installation, agrees any limitations (for example circuits that cannot be isolated), and establishes a safe system of work. On large installations a representative sample of circuits may be tested, with the sampling basis recorded on the report.

2. Visual inspection

A thorough visual inspection checks for damage, deterioration, overheating, and non-compliances that testing alone would not reveal — such as inadequate enclosures, unsuitable equipment for the environment, missing labelling, or signs of DIY alterations.

3. Dead testing

With circuits safely isolated, the electrician carries out dead tests, including:

  • Continuity of protective conductors, ring final circuits and bonding.
  • Insulation resistance to detect deterioration or damage to cable insulation.
  • Polarity to confirm correct connections.

4. Live testing

Once dead tests are complete, live tests are performed with the supply energised, including:

  • Earth fault loop impedance to confirm the installation will disconnect quickly under fault.
  • RCD operation to confirm residual current devices trip within required times.
  • Prospective fault current measurements.

5. Reporting and classification

The results are recorded on the EICR. Any observations are assigned a classification code — C1, C2, C3 or FI — and the overall outcome is declared Satisfactory or Unsatisfactory. The report also records the recommended date for the next inspection.

6. Remedial action

Where the report is unsatisfactory, the duty holder arranges for the coded items to be put right by a competent person and certified. Keeping the EICR alongside any remedial certificates provides a complete, defensible record of the installation's safety.

Frequently asked questions

Will the power be turned off during an EICR?

Yes, for part of it. Dead testing requires circuits to be isolated, so supplies are switched off for short periods. A competent electrician will agree timings in advance to minimise disruption, especially in occupied commercial premises.

How long does an EICR take?

It depends on the number of circuits and the size and complexity of the installation. A small flat may take a few hours; a large commercial building with many distribution boards can take considerably longer or be phased over several visits.

This article provides general guidance and distinguishes legislation, British Standards and good practice. It is not legal advice. Always confirm the specific duties applying to your property and tenure.

Speak to a compliance engineer

The quickest way to get started is a quick call. We'll tell you exactly what you need.

We use essential cookies to run this site. With your consent we also use analytics and marketing cookies to improve the site and measure our advertising. See our cookie policy.