An EV charging site survey is the essential first step before any installation. It replaces guesswork with a clear, costed plan for a safe and future-proofed system.
Step 1 — Understand the requirement
Establish how many chargers are needed, at what speed, for whom (staff, visitors, fleet, residents), and the expected usage pattern.
Step 2 — Assess the supply and capacity
Determine the incoming supply rating and the site's existing maximum demand, then calculate the spare capacity available for charging. This capacity assessment decides whether load management, an upgrade, or both are needed.
Step 3 — Check the earthing arrangement
Identify whether the supply is TN-S, TN-C-S (PME) or TT, and design the required open-PEN protection for PME supplies (see earthing considerations).
Step 4 — Review the board and routes
Assess the distribution board capacity and protection, and plan cabling routes and containment to the charger locations.
Step 5 — Design and cost
Produce a design to BS 7671 Section 722 — chargers, protection, load management and any upgrades — with a clear cost and a path to expand later.
Step 6 — Install, certify and plan maintenance
Install with a competent contractor, certify the work, and set up a maintenance and (where relevant) OCPP management plan. A good survey makes everything that follows straightforward.
Frequently asked questions
What does an EV charging site survey involve?
A survey assesses the incoming supply and spare capacity, the earthing arrangement, the distribution board and cabling routes, and the intended number and speed of chargers — producing a safe, costed design that meets BS 7671 Section 722.
Related service
EV Charging
Surveyed, load-managed EV-charging infrastructure for workplaces, apartment blocks, fleets and commercial sites.
Learn moreContinue reading
Knowledge
EV Charging for Apartment Blocks
EV charging in apartment blocks needs shared-supply design, load management, individual billing and careful earthing, coordinated between freeholder, agent and residents.
Learn moreKnowledge
Electrical Capacity Assessments for EV Charging
A capacity assessment measures a site's spare electrical capacity to determine how many EV chargers it can support before any supply or distribution board upgrade.
Learn moreKnowledge
Commercial EV Charging Explained
Commercial EV charging installations must be safely designed to BS 7671 (including Section 722), with the right supply capacity, earthing, protection and load management.
Learn moreKnowledge
EV Charging Distribution Board Requirements
EV chargers need suitably rated, protected circuits from an adequate distribution board — with correct RCD/RCBO protection and capacity for the charging load.
Learn moreThis article provides general guidance and distinguishes legislation, British Standards and good practice. It is not legal advice. Always confirm the specific duties applying to your property and tenure.